FastTrack (QLD)
Why wait to move into your dream home longer than you need to? Introducing FastTrack^ by Metricon – a service designed to make building a new home faster and more affordable.
If you have registered land (or land that is registering soon) you may qualify for Metricon’s FastTrack Site Start Program. We can have your contract ready in 7 days and start building your new home in as little as 10 weeks from deposit. Plus, you can save thousands off the cost of your home with our FastTrack savings.
With Metricon’s Fast Track program, you can have speed, savings and the surety of knowing when your new home build will start.
Disclaimer: ^Metricon FastTrack Program is available on new Freedom and Designer by Metricon deposits from 01.09.2026 on registered land or land registering soon in eligible QLD build regions (as defined on metricon.com.au/where-we-build). Excludes homes with non-standard structural variations outside of pre-drawn standard design options, unsewered sites, and flood affected sites. The FastTrack discount is not available with any other offer. Any construction industry shutdown periods during December / January are not included in the advertised timeframes and may extend the advertised timeframe accordingly. Guaranteed timeframes and applicable discounts may be altered, reduced or voided where there is a change in home design after the date of deposit, any variations made after signing of the contract, or delays in availability for Studio M or formal selections appointments. Appointments will be scheduled at the earliest available date and flexibility may be limited; it is the customer’s responsibility to be available on the nominated date. Any structural changes at contract stage (including site plan changes for jobs with HSTP), or where changes require new reports or approvals from external providers, will result in a minimum four (4) week delay to site start and the discount reduced accordingly. Where delays are encountered by Metricon, customers will be notified and any original discounts will be retained. Metricon is not responsible for delays relating to land, including land registration, or delays caused by third parties outside of its reasonable control, including connection of essential utillity services to site, Council-related applications, authority to commence construction from your lending body, or other external approvals, which may alter or void the guaranteed timeframes and discounts outlined. Metricon does not supply the land and is not responsible for the provision of finance or credit assistance. Metricon Homes Qld Pty Ltd QBCC 40992, NSW Contractor’s License 36654C.